Free: Contests & Raffles.
In Sept., 2011, Snohomish County Public Utility District submitted a preliminary permit application (FERC P-14295) to build a large scale hydroelectric project near Sunset Falls on the South Fork of The Skykomish River. The proposed project is directly below the popular trails leading to Lake Serene and Bridal Veil Falls. A proposed low head dam would divert water from the river above Sunset Falls. The proposed project is in conflict with with the Washington State Renewable Energy Standards and voter approved 1-937 mandates which exclude new fresh water dams from renewable energy credits.
It's not the 1940's. There are viabile alternative sources of power.
Too bad the same type of folks who are against this, were also fighting tooth and nail to stop construction of Nuclear facilities ( the second cheapest way to produce electricity) 30-40 years ago. This state had 5 under construction, only finished 1, and abandoned 2 that were 80% complete. As for this weir dam I'm not sold on fighting it as I find NIMBY's quite annoying!